|
Alligator River Bridge
Posted By: King
Date: Friday, 2-9-18, at 12:41 p.m.
It was a 45 minute wait Sunday for two barges spaced out to go through it. They need a new bridge with a high span.
They have been making improvements with better railing that you can see in the headlights at night in the rain and fog.
Also looked like the old Manns Harbor bridge was being worked on .......
Expect Alligator bridge openings to take longer than usual
|
The Salty Board is maintained by King with WebBBS 5.12.